| 1. | What is your estimated budget for this project 项目的总预算您对本项目的预算是多少 |
| 2. | Compare , analyze and explain actual results with estimated budget 根据评估预算,比较、分析和解释实际效果。 |
| 3. | Engineering project estimate budget 工程项目概预算 |
| 4. | Issues to be given attention to in preparation of estimate budget of bridge works 桥梁工程预算编制中应注意的几个问题 |
| 5. | At this stage , we are not in a position to provide an estimated budget for the whole project 在现阶段,我们难以提供整项发展计划的预算费用。 |
| 6. | Survey and design contracts shall provide the time for delivery of the basic survey or design data and design documents ( including an estimated budget ) by both parties , the quality requirements of the design , other conditions for coordination and other similar provisions 勘察、设计合同中,应规定双方提交勘察、设计基础资料、设计文件(包括概预算)的时间,设计的质量要求以及其他协作条件等条款。 |